Tuesday, January 27, 2009

January 27, 2009

We've been in a deep freeze for almost a month I think. The few times it's warmed up a bit it snowed and we've been snowed in. The house progress is at a stand still. Donnie's new plan is to work an hour each day that he is home. That should jump start things.

In the meantime I made a list of what needs to be done inside the house to complete it.

House Projects - Inside

Donnie and Alicia’s bedroom:
shelves in closet
baseboard in closet
trim around closet door
top of wall above closet
trim along dormer ceiling
attach baseboard on long wall
make crawlspace entrance
wall and door into bedroom

Loft:
bookshelf and wall in loft
baseboard in loft
railing around stairs
edge of top stair tread
door on bathroom
attic ladder
attic wall and entrance

Isaac’s bedroom:
door frame
closet door and frame
top shelf in closet
permanent loft railing
trim along dormer ceiling
permanent ladder
loft floor trim
cover ceiling beam
shelves along wall

Bathroom:
plumb shower
install tile
plumb sink
install vanity and sink
plumb tub
finish dry wall
paint
door and window trim

Pantry:
counter top
cabinet trim
inside door trim
install baseboard

Bathroom:
tile trim
permanent inside door trim
finish window trim
cabinet behind door with counter top
vanity under sink
cover around toilet line
soffit to cover vents on ceiling
crack filling around trim at top
handle on door

Entry:
finish wall around closet
closet door
closet rod and shelves
cubbies above hooks
boot shelf below bench
beam trim above den door
replace broken baseboard piece by den door

Kitchen:
framing for island
install cooktop
remove old stove
facework for perimeter cabinets
install oven
drawer hardware
doors
facework for island
drawer hardware
doors
paint and stain woodwork
cut and glue butcher block
plane butcher block
install butcher block
install baseboards
bulkhead to cover plumbing overhead
install light fixture

Dining:
get new table
paint new chairs
install overhead light
install dimmer switch

Living:
install light fixture
stain stair runners and reinstall
cut and install new stair treads
decide on stairwell railing
window seat

Den:
install baseboard end
electrical outlet covers

Basement:
replace stairs
replace last floor board before stairs
build storage under stairs
bookshelves
cover ceiling
stone under stove
shelves above laundry
countertop in laundry
gate/door for dogs
electrical, phone and TV wiring
window trims